Guide
Move an instance between locations
Snapshot the disk, deploy in the destination, restore, re-apply the network configuration and measure latency before cutting over.
1. Check what the location changes
The legal process track, the latency to your users and the power footprint. Reykjavík and Zürich sit outside the EU's immediate reach; Amsterdam and Sofia do not.
2. Snapshot the source
Instance, Snapshots, Create. A running disk cannot be moved between locations, so the snapshot is the transferable artifact.
3. Deploy the same plan in the destination
Order the identical plan and image in the new location. The new instance gets its own IPv4, so anything hardcoded to the old address needs updating.
4. Restore the snapshot onto the target
Target instance, Snapshots, Restore from snapshot, pick the source image. Boot takes 30 to 60 seconds after the restore completes.
5. Re-apply the network configuration
The interface and address change, so check /etc/netplan or the ifcfg file and confirm with ip -br a. A guest that kept the old static address comes up unreachable.
6. Measure latency from where your users are
mtr -rwc 50 203.0.113.10 from two or three regions, compared with the old location. Do this before the DNS change, not after.
7. Retire the old instance after 48 hours
Cancel the source once traffic is stable. Running both for a few days costs one month of one plan and removes the rollback problem entirely.
FAQ
Questions we get on this page
Can an instance be moved without a rebuild?+
Is the cross-location transfer metered?+
Ready when you are
Tell us what you need. A human answers.
Pilot stage: one facility in Reykjavík, plans confirmed by hand, payment in crypto. Write to the desk and you get a real person, not a queue.