Feature
Delivered in under five minutes, automated
Payment clears, the build starts, credentials land in the panel
Orders are built by an automated pipeline rather than by a person reading a queue. The payment is credited, the instance is allocated from stock in the city you chose, and the credentials appear in the client area. Under five minutes from credit is the standard case.
Every plan page states what the build includes: the operating system, the IPv4 and IPv6 allocation, the snapshot policy and the filter ceiling. Nothing is installed by hand afterwards to make the server match the page.
The pipeline, in order
Payment credited, stock reserved, image cloned, network attached, hostname and reverse DNS set, credentials written to the panel. Each step reports into the ticket, so a failure names the one that stopped.
Images available at build
Debian, Ubuntu LTS, AlmaLinux, Rocky and Windows Server 2022 on the relevant plans, plus a plain ISO mount on KVM. A custom image can be uploaded and booted without a rebuild.
What takes longer, and why
Dedicated servers with IPMI handover and GPU-BEAST nodes sit in a longer queue. A same-day order for three or more GPU nodes is scheduled rather than instant, and the ticket says so at the time.
Addresses and reverse DNS
The IPv4 and the /64 attach at build, and reverse DNS is set in the panel without a ticket. A /29 or /28 on a dedicated plan is provisioned with the server rather than bolted on later.
Resize and rebuild
A resize keeps the disk and changes the allocation after a reboot. A rebuild re-clones the image and destroys the disk, which is why the snapshot button sits beside it.
FAQ
Questions we get on this page
What if the build fails?+
Is the five minutes from payment or from order?+
Ready when you are
Tell us what you need. A human answers.
Pilot stage: one facility in Reykjavík, plans confirmed by hand, payment in crypto. Write to the desk and you get a real person, not a queue.